How should an administrator perform a planned failover between Site A and Site B in a disaster recovery setup?

  1. Choose Migrate on the Primary site within the Data Protection Dashboard

  2. Choose Migrate on the Secondary site within the Data Protection Dashboard

  3. Click Activate on the Secondary site and run deactive NCLI command on Primary site

  4. Click Activate on the Secondary site within the Data Protection Dashboard

The correct answer is: Choose Migrate on the Primary site within the Data Protection Dashboard

In a disaster recovery setup, performing a planned failover involves switching operations from the primary site to a secondary site to ensure business continuity in case of a failure at the primary location. Choosing the option to migrate on the primary site within the Data Protection Dashboard is the appropriate action to execute this planned failover. When selecting migrate on the primary site, the process ensures that the data and workloads are transferred correctly to the secondary site. This is particularly important because it allows the administrator to manage the migration effectively, ensuring that any changes made at the primary site are properly replicated before moving to the secondary site. Additionally, this approach minimizes downtime and data loss while facilitating a controlled failover process. The other options involve either commands that do not align with the typical workflow for planned failover or take place from the secondary site, which would not be the standard practice for initiating a migration. The focus must be on the primary site to manage the assets that will be transitioned to the secondary site effectively, cementing the chosen answer as the correct method for achieving a planned failover in a disaster recovery scenario.